CASE STUDY
Distillery NDT inspection
& Proactive Maintenance Plans
Food & Drink
CLIENT
Major Distillery
LOCATION
Scotland
SERVICES
• NDT Inspection
• Planned Maintenance
• Refurbishment and Servicing

THE CHALLENGE
Plate Heat Exchangers (PHE) are a critical component in the distillery process and, if found to be working ineffectively, can result in serious delays and outages.
Our client had several issues relating to their plate packs at one of their distilleries, including various plates with the wrong gaskets attached, old and new plates incorrectly mixed, and not to the correct specification.
Additionally, the overall configuration of several plate packs was incorrect leading to the units not performing to their full efficiency.
HOW WE HELPED
As a trusted partner to our client, we were asked to come in and provide crucial service and maintenance support.
Having conducted a thorough review of the plate packs, including a nondestructive testing (NDT) inspection, the OSSO team swiftly identified where the issues were and proceeded to refurb all the plate packs bringing each one back to the correct specification.
We then worked with William Grant to produce a proactive maintenance schedule tailored to their specific requirements. As part of the maintenance planning, we ensure all plate packs are tracked, serviced and performance monitored, with a spare plate pack available for every unit, mitigating the risk of lengthy downtime if an unscheduled outage were to arise.
RESULTS
Our approach and experience ensured we delivered swift and seamless support, providing assurance that our client’s PHE packs are fully inspected, tracked, and continuously monitored — enabling quick turnaround times for future inspections
- Minimal downtime
- Proactive maintenance planning
- Full turnkey servicing in-house – no third-party
- Detailed examination with NDT inspection
CONTACT OSSO
Got a question
about a project?
Related Case Studies
Geothermal drilling achieving a 25% temperature reduction

- 25% temperature reduction
- Full-service maintenance contract
- Annual equipment swap out and refurb programme
Reduce the burden of skip and ship

- 79 % of waste liquid discharged at source with oil-in-waters below the legislative discharge consent of 30ppm
- Delivered 7 days ahead of schedule
- Reduced shipping, road haulage and disposal costs for waste movement
- Reduced stress on POB and site resources
- Reduced environmental risk and carbon footprint for the overall operation